As architectural designers, Solent Architecture make it a natural part of our design process to specify work which complies with building regulations - so you can relax, knowing that all legal requirements will be met.
Building Regulations will apply if you construct or change buildings in particular ways. These include numerous tasks which will be a natural part of any new-build project and almost every refurbishment, house extension or loft conversion. You, or someone acting on your behalf, should check with the LPA before the work is done as to the legal requirements. Typically, these will be things like
- Replacing fuse boxes and connected electrics
- Installing a bathroom that involves plumbing
- Changing electrics near a bath or shower
- Putting in a fixed air-conditioning system
- Replacing windows and doors
- Replacing roof coverings on pitched and flat roofs
- Installing or replacing a heating system
- Adding extra radiators to a heating system
Although this may seem like a daunting list, using appropriately qualified and registered trades people (“competent persons,” such as properly trained and registered electricians and plumbers) will mean that much of the work will be self-certified by those specialists - the final checks by a building Control Surveyor should then be straightforward.